Envirochem Analytical Laboratories LTD articles
Location:
New Forest
Service:
Environmental Water Sampling - Lake
Project Description:
Envirochem first visited the lake to identify and prioritise the high risk outlet points.
Location:
Newton Abbot
Service:
Postal Service
Project Description:
Envirochem carries out the analysis of environmental water samples during the summer season to measure the water quality as they carry out
Location:
GP Surgeries
Service:
Legionella risk assessment by microbiological testing.
Project Description:
A Legionella risk assessment survey is an examination of the potential risks presented by engineered wa
Project Highlights
Asbestos air monitoring associated with asbestos removal and remediation was undertaken on the Fawley Power Station site on a daily basis for a duration of four years on behalf of CAPE Plc.
Demolition asbestos survey have also been undertaken of all buildings due to demolished as a consequence of the closure of the plant and the proposed decommissioning and demolition. The demolition
Project Highlights
Envirochem work very closely with the University Hospital Southampton NHS Foundation Trust and their chosen contractors to assist in the management of asbestos containing materials within all buildings owned and managed by the trust.
Project Description
For the past few years we have assisted the University Hospital
Project Highlights
Envirochem managed the asbestos removal at the very high profile incident within the Buncefield Terminal. Our advice ensured that emergency repair works to the fuel terminal were not delayed during the reconstruction and rebuilding of the project.
Project Description
At 0600 on Sunday the 11th December 2005 a fault at th
Project Highlights
Envirochem are responsible for organising all consultant and analytical works relating to the removal of all asbestos containing materials from a busy working airport. Our work and advice ensured that the airport maintained its high standards and the airports customers and staff are able to operate in a safe and controlled environment.
Project
Project Highlights
- Asbestos Awareness Lecturing
- Type 1,2 and 3 asbestos surveys
- Creation of asbestos removal specification
- Generating independent quotations
- Independently generating best ‘fit’ for client
- Asbestos Removal
- Project management
- Asbestos air testing
- Client liason
Project Highlights
Envirochem managed and offered the complete package at the best price to fit the clients time restraints and allowing continued unaffected work within the factory. Envirochem utilised asbestos licensed scaffolders, electricians, ceiling fixers, and asbestos removers. Keeping the continuation of the project and overflow of the trades was a logistical difficulty that we completed smoothly.
Project Highlights
For a four month duration in 2014 a demolition asbestos survey was undertaken on behalf of Cape plc at the Polimeri Europa UK Ltd site in Hardley on the outskirts of Southampton. The project involved undertaking demolition asbestos surveys of all buildings on site that are due to be demolished due to the closure of the plant.
Project Desc