Suzhou Jono Environmental Technology Co., Ltd
35 Articles found

Suzhou Jono Environmental Technology Co., Ltd articles

The Wujiang Construction Waste Recycling Project is a major environmental and public infrastructure initiative located on the west side of Jinger Road in the Dongtai Lake Resort Area, Wujiang District, Suzhou, China. The project covers a land area of 44.45 mu (approx. 29,630 m²) and has a total construction area of 16,099.39 m².

Nov. 24, 2025

The Longyan Kitchen Waste Treatment Plant Project is located in Yangkeng, Linbang Village, Tieshan Town, Xinluo District, Longyan City, Fujian Province, China. Developed by Longyan Longjinhe Development Co., Ltd., the facility covers a total area of 25,904 square meters (approximately 38.9 mu), with a construction area of 6,834 square meters and a total investment of around RMB 120 million.

Nov. 24, 2025

Project Overview

This project is a mechanical pre-treatment system for mixed municipal solid waste (MSW), designed to support the efficient operation of a circulating fluidized bed (CFB) boiler incineration process. With a treatment capacity of 1,000 tons per day, the facility is engineered to deliver both environmental and operational benefits by ensuring waste is prepared in an optimized manner before combustion.

The pre-treatment line integrates two-stage shredding an

Nov. 24, 2025

Project Overview

The Shanghai Xupu Two-Network Integration Hub Project, executed by JONO Environmental Technology, is a comprehensive demonstration project that integrates intelligent collection, AI-powered fine sorting, automated packaging and transfer, and smart warehousing into a single unified system.

Nov. 24, 2025

Background and Purpose

Mixed MSW refers to a broad spectrum of waste types, including recyclable waste, food and kitchen waste, hazardous waste, and combustible materials. JONO has proactively developed and deployed MBT technology that enables automated classification, sorting, and recovery of valuable materials from mixed waste streams.

The goal is to reduce landfill dependency, optimize incineration processes, and

Nov. 24, 2025

Project Overview

The Taizhou Gaogang Bulky Waste Treatment Project, located in the Gaogang Economic Development Zone of Taizhou City, Jiangsu Province, is designed with a treatment capacity of 100 tons/day, and a single-line processing capacity of 10–15 tons/hour. The facility primarily handles discarded household items such as sofas, mattresses, tables, chairs, and garden waste from residential areas. After sorting and shredding, metal materials are recycled, w

Nov. 24, 2025

Project Overview

Located in Guannan County, Lianyungang City, the Lianyungang Guannan Construction & Decoration Waste Recycling Project is a key regional initiative designed to advance green urban development and circular economy practices. With an annual treatment capacity of 300,000 tons, the facility provides an efficient and environmentally responsible solution for processing construction and decoration waste generated from urbanization and infrastructure p

Nov. 24, 2025

Background – The Challenge of Kitchen Waste

China generates over 120 million tons of kitchen waste annually, placing significant pressure on landfills and incineration facilities. In Nanjing, kitchen waste accounts for a large proportion of municipal solid waste and is characterized by high moisture, high salt, and high organic content, making traditional treatment methods inefficient and environmentally unsustainable.

Without proper treatment

Nov. 24, 2025

Project Overview

The Nanning Santang Bulky Waste Treatment Center is located on the first floor of the Santang Municipal Solid Waste Transfer Station. The facility spans 600 square meters and is designed to process up to 100 tons of bulky waste, with a single processing line capacity of 8–15 tons per hour.

The project focuses on collecting and treating bulky household waste such as sofas, beds, mattresses, and chairs, using a door-to-door collection s

Nov. 24, 2025

In line with the principles of resource reduction, harmless treatment, and reuse, the project integrates advanced equipment and smart management systems to minimize environmental impact and maximize the value of waste materials. The facility serves as a crucial part of the regions circular economy strategy. The project is capable of processing up to 600 tons of renovation waste per day, with a processing workshop coveri

Nov. 24, 2025